<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>The Electric Heating Company</title>
	<atom:link href="http://www.electric-heatingcompany.co.uk/index.php/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.electric-heatingcompany.co.uk</link>
	<description>for your heating and hot water requirements</description>
	<lastBuildDate>Wed, 02 May 2012 10:29:27 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>One flue over&#8230;</title>
		<link>http://www.electric-heatingcompany.co.uk/index.php/blog/one-flue-over/</link>
		<comments>http://www.electric-heatingcompany.co.uk/index.php/blog/one-flue-over/#comments</comments>
		<pubDate>Mon, 30 Apr 2012 12:35:56 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Advice for flues in voids]]></category>
		<category><![CDATA[boilers]]></category>
		<category><![CDATA[Concealed flue systems]]></category>
		<category><![CDATA[Concealed flues]]></category>
		<category><![CDATA[Concealed gas flues]]></category>
		<category><![CDATA[EHC]]></category>
		<category><![CDATA[electric heating company]]></category>
		<category><![CDATA[flue]]></category>
		<category><![CDATA[Flues concealed in voids]]></category>
		<category><![CDATA[Flues in ceiling voids]]></category>
		<category><![CDATA[Flues in voids]]></category>
		<category><![CDATA[gas central heating]]></category>
		<category><![CDATA[Gas flue in voids]]></category>
		<category><![CDATA[Gas flue inspection]]></category>
		<category><![CDATA[HSE gas safety alert]]></category>
		<category><![CDATA[internal walls]]></category>
		<category><![CDATA[New gas flue regulations]]></category>
		<category><![CDATA[No access to gas flues]]></category>
		<category><![CDATA[Problems with gas flues]]></category>
		<category><![CDATA[slimjim]]></category>
		<category><![CDATA[stud walls]]></category>

		<guid isPermaLink="false">http://www.electric-heatingcompany.co.uk/?p=2252</guid>
		<description><![CDATA[If you are frequently encountering problems when dealing with concealed flues, it could be that EHC have the solution.

The introduction of fan-flued gas appliances in the mid 1990s allowed gas central heating boilers to be installed away from external walls. This meant that builders could design newbuild and refurbishment properties with boilers being installed on internal walls to make better use of [...]]]></description>
			<content:encoded><![CDATA[<p>If you are frequently encountering problems when dealing with concealed flues, it could be that EHC have the solution.</p>
<p><a href="http://www.electric-heatingcompany.co.uk/wp-content/uploads/2012/04/Installer-Mag-advertorial-copy.jpg" rel="lightbox[2252]"><img class="alignnone size-full wp-image-2261" title="Installer Mag advertorial  copy" src="http://www.electric-heatingcompany.co.uk/wp-content/uploads/2012/04/Installer-Mag-advertorial-copy.jpg" alt="" width="610" height="780" /></a></p>
<p>The introduction of fan-flued gas appliances in the mid 1990s allowed gas central heating boilers to be installed away from external walls. This meant that builders could design newbuild and refurbishment properties with boilers being installed on internal walls to make better use of the available space. The flues to these boilers were, in some cases, routed through voids in the ceiling space (and through stud walls) between properties above.</p>
<p><strong>Safety alert<br />
</strong>On 2 October 2008, the Health and Safety Executive issued a safety alert to raise awareness of the potential dangers from certain types of flues connected to gas-fired central heating installations in some properties – particularly, but not exclusively, a large number of flats and apartments completed since about 2000. The concern is that these may not have been installed properly or may have fallen into disrepair.</p>
<p>To comply with The Gas Safety (Installation and Use) Regulations (GSUR), a flue must be visibly inspected throughout its route. However, if built into a ceiling void, the ability to do so is impaired unless inspection panels are part of the construction. In November 2010, the Health and Safety Executive issued new guidelines and a Landlord has until 31 December 2012 to arrange for inspection hatches for such flues.</p>
<p><strong>At risk<br />
</strong>After 1 January 2013, any gas engineer working on a system where the complete flue is not visible will advise the Landlord that the system is ‘at risk’ in accordance with the Gas Industry Unsafe Situations Procedure (GIUSP). With the owner’s permission, the engineer will turn off the gas supply to the boiler so it cannot be used.</p>
<p>Urgent action needs to be taken as after the 31 December 2012 any appliance where the complete flue is not visible will be condemned and disconnected.</p>
<p>Although the gas boiler and flue may be condemned this does not mean that the system needs to be condemned.</p>
<p>By installing an electric boiler, the homeowner will benefit from the same controllability and flexibility that their gas heating system offered.</p>
<p><strong>Flexibility and savings<br />
</strong>As electric boilers are silent in operation and do not require flueing, they can be located in almost any room in a property. Furthermore, as there is no Annual Safety Inspection required on electric boilers, there will be significant cost savings to Private and Social Landlords. With electric boiler outputs from 4kW to 14.4kw on single phase electricity and 3-phase 24kW and 36kW outputs, The Electric Heating Company (EHC) can offer a central heating solution to most properties. There is a misconception in the market that electric heating is expensive to operate. However, EHC offers impartial advice on the best electricity tariffs within the UK to ensure that running costs are kept to an affordable level.</p>
<p><a href="http://www.electric-heatingcompany.co.uk/wp-content/uploads/2012/04/Installer-Mag-advertorial-2012.pdf" target="_blank">CLICK HERE TO VIEW OUR SOLUTION &gt;&gt;</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.electric-heatingcompany.co.uk/index.php/blog/one-flue-over/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>**Watch New Movies**</title>
		<link>http://www.electric-heatingcompany.co.uk/index.php/blog/exciting-new-movies/</link>
		<comments>http://www.electric-heatingcompany.co.uk/index.php/blog/exciting-new-movies/#comments</comments>
		<pubDate>Wed, 22 Feb 2012 22:47:54 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[EHC]]></category>
		<category><![CDATA[products]]></category>
		<category><![CDATA[videos]]></category>

		<guid isPermaLink="false">http://www.electric-heatingcompany.co.uk/?p=2133</guid>
		<description><![CDATA[We have recently had some new exciting movies commissioned on a range of our products and we have uploaded them to our TV Channel for you to have a look at.
Why not click here and have a look for yourself and let us know what you think!!!
In the meantime, if you have any questions regarding [...]]]></description>
			<content:encoded><![CDATA[<p>We have recently had some new exciting movies commissioned on a range of our products and we have uploaded them to our <a href="http://www.moviecom.tv/ehc" target="_blank" onclick="pageTracker._trackPageview('/outgoing/www.moviecom.tv/ehc?referer=');">TV Channel</a> for you to have a look at.</p>
<p><a href="http://www.moviecom.tv/ehc" target="_blank" onclick="pageTracker._trackPageview('/outgoing/www.moviecom.tv/ehc?referer=');"><em><span style="color: #ff6600;"><strong>Why not click here and have a look for yourself and let us know what you think!!!</strong></span></em></a></p>
<p>In the meantime, if you have any questions regarding any of our products please do not hesitate in <a href="http://www.electric-heatingcompany.co.uk/index.php/contact/">contacting us</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.electric-heatingcompany.co.uk/index.php/blog/exciting-new-movies/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>** EHC Launch Panel Heaters **</title>
		<link>http://www.electric-heatingcompany.co.uk/index.php/blog/ehc-panel-heaters/</link>
		<comments>http://www.electric-heatingcompany.co.uk/index.php/blog/ehc-panel-heaters/#comments</comments>
		<pubDate>Wed, 22 Feb 2012 22:03:43 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[contemporary]]></category>
		<category><![CDATA[EHC]]></category>
		<category><![CDATA[electric heating company]]></category>
		<category><![CDATA[electronic thermostat]]></category>
		<category><![CDATA[free standing]]></category>
		<category><![CDATA[highly efficient]]></category>
		<category><![CDATA[modern]]></category>
		<category><![CDATA[panel heaters]]></category>
		<category><![CDATA[slim]]></category>
		<category><![CDATA[unique design]]></category>
		<category><![CDATA[wall mounted]]></category>

		<guid isPermaLink="false">http://www.electric-heatingcompany.co.uk/?p=2110</guid>
		<description><![CDATA[








Modern, Slim and Highly Efficient, the clean, contemporary styling of these heaters allows them to blend into any room in your home. Perfect where space is at a premium. They can be wall mounted or free-standing. The perfect heating solution throughout the home. Suitable for properties with Solar PV.














 

 



 
]]></description>
			<content:encoded><![CDATA[<table border="0" width="607">
<tbody>
<tr>
<td colspan="2"><span class="style12"><a href="http://www.electric-heatingcompany.co.uk/index.php/ehc-panel-heaters/"><img class="alignnone size-full wp-image-2112" title="ph_header" src="http://www.electric-heatingcompany.co.uk/wp-content/uploads/2012/02/ph_header.jpg" alt="" width="575" height="143" /></a></p>
<p></span></td>
</tr>
<tr>
<td colspan="2">
<blockquote>
<p class="style16">Modern, Slim and Highly Efficient, the clean, contemporary styling of these <span style="color: #ff6600;"><a href="http://www.electric-heatingcompany.co.uk/index.php/ehc-panel-heaters/" target="_blank">heaters</a></span> allows them to blend into any room in your home. Perfect where space is at a premium. They can be wall mounted or free-standing. The perfect heating solution throughout the home. Suitable for properties with Solar PV.</p>
</blockquote>
</td>
</tr>
<tr>
<td width="324">
<div><a href="http://www.electric-heatingcompany.co.uk/index.php/ehc-panel-heaters/"><img class="alignnone size-full wp-image-2113" title="ph_image" src="http://www.electric-heatingcompany.co.uk/wp-content/uploads/2012/02/ph_image.jpg" alt="" width="324" height="421" /></a></div>
</td>
<td width="273" valign="top"><img class="alignnone size-full wp-image-2111" title="ph_chart" src="http://www.electric-heatingcompany.co.uk/wp-content/uploads/2012/02/ph_chart.jpg" alt="" width="273" height="441" /></td>
</tr>
</tbody>
</table>
<map name="Map">
<area shape="rect" coords="441,65,682,79" href="http://www.electric-heatingcompany.co.uk/index.php/slimjim-electric-boiler/" target="_blank" />
<area shape="rect" coords="400,80,681,98" href="mailto:info@electric-heatingcompany.co.uk" target="_blank" />
<area shape="rect" coords="12,14,211,109" href="http://www.electric-heatingcompany.co.uk/index.php/slimjim-electric-boiler/" target="_blank" /> </map>
<map name="Map2">
<area shape="rect" coords="295,51,648,86" href="mailto:info@electric-heatingcompany.co.uk" target="_blank" /> </map>
<map name="Map3">
<area shape="rect" coords="396,74,680,95" href="mailto:info@electric-heatingcompany.co.uk" />
<area shape="rect" coords="433,62,679,75" href="http://www.electric-heatingcompany.co.uk" target="_blank" />
<area shape="rect" coords="16,13,166,91" href="http://www.electric-heatingcompany.co.uk" target="_blank" /> </map>
]]></content:encoded>
			<wfw:commentRss>http://www.electric-heatingcompany.co.uk/index.php/blog/ehc-panel-heaters/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>** New Launch of SlimJim Electric Flow Boiler **</title>
		<link>http://www.electric-heatingcompany.co.uk/index.php/blog/slimjim-electric-flow-boiler/</link>
		<comments>http://www.electric-heatingcompany.co.uk/index.php/blog/slimjim-electric-flow-boiler/#comments</comments>
		<pubDate>Wed, 22 Feb 2012 21:56:12 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[compact]]></category>
		<category><![CDATA[Electric Boiler]]></category>
		<category><![CDATA[electric flow boiler]]></category>
		<category><![CDATA[electric heating company]]></category>
		<category><![CDATA[fully controllable]]></category>
		<category><![CDATA[heating engineers]]></category>
		<category><![CDATA[slimjim]]></category>

		<guid isPermaLink="false">http://www.electric-heatingcompany.co.uk/?p=2091</guid>
		<description><![CDATA[







EHC offer the most comprehensive  range of electric boilers in the market and with our wealth of knowledge  and technical expertise we have designed the SlimJim Electric Flow Boiler.
The compact design of the boiler makes it ideal for heating applications where space is at a premium. The SlimJim  can be installed by [...]]]></description>
			<content:encoded><![CDATA[<table border="0" width="598">
<tbody>
<tr>
<td width="300"><a href="http://www.electric-heatingcompany.co.uk/index.php/slimjim-electric-boiler/"><img class="alignnone size-full wp-image-2089" title="slim1" src="http://www.electric-heatingcompany.co.uk/wp-content/uploads/2012/02/slim1.jpg" alt="" width="280" height="144" /></a></td>
<td rowspan="2" width="249">
<table style="height: 459px;" border="0" width="252">
<tbody>
<tr>
<td>EHC offer the most comprehensive  range of electric boilers in the market and with our wealth of knowledge  and technical expertise we have designed the SlimJim Electric Flow Boiler.</p>
<p>The compact design of the boiler makes it ideal for heating applications where space is at a premium. The SlimJim  can be installed by professional heating engineers in apartments,  domestic dwellings, holiday homes and light commercial properties.</p>
<p>The SlimJim is a fully  controllable electric flow boiler which is designed to maximise cupboard  space. The boiler also has an easy-fit front cover for future  maintenance purposes.</p>
<p>The  user-friendly Front Control Panel incorporates  heat mode and fault finding indicators, an on/off switch and easy-to-use  temperature control setting. Safety is of paramount importance to EHC  and as such our SlimJim boiler has been designed to include a unique high current safety cut-out device that protects the boiler from over-heating.</td>
</tr>
</tbody>
</table>
</td>
</tr>
<tr>
<td><a href="http://www.electric-heatingcompany.co.uk/index.php/slimjim-electric-boiler/"><img class="size-full wp-image-2090 alignnone" title="slim2" src="http://www.electric-heatingcompany.co.uk/wp-content/uploads/2012/02/slim2.jpg" alt="" width="250" height="364" /></a></td>
</tr>
<tr>
<td colspan="2" height="146"><span class="style12"> </span></p>
<table style="height: 354px;" border="1" cellpadding="1" width="597" bgcolor="#ff9933" bordercolor="#ffffff">
<tbody>
<tr style="padding-left: 60px;">
<td width="310">
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">Compact in size: 912mm x 203mm x 172mm</span></p>
</blockquote>
</td>
<td width="262">
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">No mandatory boiler servicing required</span></p>
</blockquote>
</td>
</tr>
<tr style="padding-left: 60px;">
<td>
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">Outputs from 4k W up to 14.4k W</span></p>
</blockquote>
</td>
<td>
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">Soft start approach to avoid power surges</span></p>
</blockquote>
</td>
</tr>
<tr>
<td>
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">Easy to install</span></p>
</blockquote>
</td>
<td>
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">Can be used with standard radiators &amp; thermostatic valves</span></p>
</blockquote>
</td>
</tr>
<tr>
<td>
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">100% Efficient</span></p>
</blockquote>
</td>
<td>
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">Adjustable boiler temperature control</span></p>
</blockquote>
</td>
</tr>
<tr>
<td height="22">
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">Stainless Steel Heat Exchanger</span></p>
</blockquote>
</td>
<td>
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">In-built diagnostics</span></p>
</blockquote>
</td>
</tr>
<tr>
<td>
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">Stainless Steel Heating Elements</span></p>
</blockquote>
</td>
<td>
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">Selection of Heatpacks available </span></p>
</blockquote>
</td>
</tr>
<tr>
<td>
<blockquote class="style7">
<p style="padding-left: 30px;"><span class="style8">Fully modulating boiler with 6 stage heating</span></p>
</blockquote>
</td>
<td>
<blockquote><p><span class="style7"> </span></p></blockquote>
</td>
</tr>
</tbody>
</table>
</td>
</tr>
<tr>
<td colspan="2">
<h5 style="text-align: left;"><span class="style12"> </span><span style="color: #ffffff;">.</span><br />
The SlimJim can be supplied as boiler only or complete with a choice of Heat Packs.</h5>
<h5 style="text-align: left;">Please contact our Sales Team on <span style="color: #ff6600;"><strong><span class="style11">01698 820533</span></strong></span> for further information.</h5>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://www.electric-heatingcompany.co.uk/index.php/blog/slimjim-electric-flow-boiler/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>New Exhibition dates for 2012</title>
		<link>http://www.electric-heatingcompany.co.uk/index.php/blog/new-exhibition-dates/</link>
		<comments>http://www.electric-heatingcompany.co.uk/index.php/blog/new-exhibition-dates/#comments</comments>
		<pubDate>Wed, 22 Feb 2012 13:33:53 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Birmingham]]></category>
		<category><![CDATA[date]]></category>
		<category><![CDATA[ehc renewables]]></category>
		<category><![CDATA[exhibition dates]]></category>
		<category><![CDATA[greenbuild expo]]></category>
		<category><![CDATA[Installer Live]]></category>
		<category><![CDATA[june]]></category>
		<category><![CDATA[manchester]]></category>
		<category><![CDATA[may]]></category>
		<category><![CDATA[nmbs]]></category>
		<category><![CDATA[october]]></category>
		<category><![CDATA[telford]]></category>
		<category><![CDATA[venue]]></category>

		<guid isPermaLink="false">http://www.electric-heatingcompany.co.uk/?p=1535</guid>
		<description><![CDATA[Below are a list of exhibitions EHC will be exhibiting at in 2012, so please come along and see what EHC can do for you.



EXHIBITIONS 2012


Exhibition
Venue
Date


Greenbuild Exhibition 

Manchester Central
9th-10th May 2012


NMBS Exhibition
www.nmbs.co.uk

Telford International Centre
16th May 2012


The Facilities Show

NEC Birmingham
15th &#8211; 17th May 2012




]]></description>
			<content:encoded><![CDATA[<p>Below are a list of exhibitions EHC will be exhibiting at in 2012, so please come along and see what EHC can do for you.</p>
<table style="height: 355px;" border="1" cellspacing="0" cellpadding="4" width="502" bordercolor="#cccccc">
<tbody>
<tr>
<td style="text-align: center;" colspan="3" height="36" bgcolor="#ae290f"><strong><span style="color: #ffffff;"><span class="style9">EXHIBITIONS 2012</span></span></strong></td>
</tr>
<tr style="text-align: center;">
<td width="186" height="28" bgcolor="#dc7035"><strong><span style="color: #ffffff;"><span class="style7">Exhibition</span></span></strong></td>
<td width="180" bgcolor="#dc7035"><strong><span style="color: #ffffff;"><span class="style7">Venue</span></span></strong></td>
<td width="130" bgcolor="#dc7035"><strong><span style="color: #ffffff;"><span class="style7">Date</span></span></strong></td>
</tr>
<tr style="padding-left: 60px; text-align: center;">
<td style="text-align: center;" height="31"><strong><span class="style5">Greenbuild Exhibition </span></strong><span class="style5"><br />
</span></td>
<td style="text-align: center;">Manchester Central</td>
<td>9th-10th May 2012</td>
</tr>
<tr style="padding-left: 60px; text-align: center;">
<td style="text-align: center;" height="31"><strong><span class="style5">NMBS Exhibition<br />
</span></strong><span class="style5">www.nmbs.co.uk<br />
</span></td>
<td style="text-align: center;">Telford International Centre</td>
<td>16th May 2012</td>
</tr>
<tr>
<td style="text-align: center;" height="37"><strong><span class="style5">The Facilities Show<br />
</span></strong></td>
<td style="text-align: center;"><span class="style5">NEC Birmingham</span></td>
<td style="text-align: center;">15th &#8211; 17th May 2012<span class="style5"><br />
</span></td>
</tr>
</tbody>
</table>
]]></content:encoded>
			<wfw:commentRss>http://www.electric-heatingcompany.co.uk/index.php/blog/new-exhibition-dates/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>EHC team up with OLCI</title>
		<link>http://www.electric-heatingcompany.co.uk/index.php/blog/ehc-team-up-with-olci/</link>
		<comments>http://www.electric-heatingcompany.co.uk/index.php/blog/ehc-team-up-with-olci/#comments</comments>
		<pubDate>Tue, 07 Jun 2011 13:26:14 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[automatic bypass]]></category>
		<category><![CDATA[Birmingham]]></category>
		<category><![CDATA[bristol]]></category>
		<category><![CDATA[comet electric boiler]]></category>
		<category><![CDATA[EHC]]></category>
		<category><![CDATA[Electric Boiler]]></category>
		<category><![CDATA[electric boiler training]]></category>
		<category><![CDATA[Electrical]]></category>
		<category><![CDATA[fusion electric boiler]]></category>
		<category><![CDATA[gas]]></category>
		<category><![CDATA[London]]></category>
		<category><![CDATA[magnetic filter]]></category>
		<category><![CDATA[olci]]></category>
		<category><![CDATA[olci construction training]]></category>
		<category><![CDATA[Plumbing]]></category>
		<category><![CDATA[specialise]]></category>
		<category><![CDATA[stainless steel heat exchanger]]></category>
		<category><![CDATA[training]]></category>
		<category><![CDATA[training centres]]></category>
		<category><![CDATA[uk]]></category>

		<guid isPermaLink="false">http://www.electric-heatingcompany.co.uk/?p=1532</guid>
		<description><![CDATA[
EHC team up with OLCI to provide Electric Boiler Training
EHC have been specialist suppliers of the Fusion Electric Boiler for many years. They have also recently launched the Comet Electric Boiler which incorporates a Stainless Steel Heat Exchanger, Automatic Bypass and Magnetic Filter. Due to the increased Sales and Enquiry levels for Electric Boilers during [...]]]></description>
			<content:encoded><![CDATA[<h2><strong><img class="alignnone size-full wp-image-1422" title="PR - EHC team up with OLCI to provide Electric Boiler training - May 11" src="http://www.ehc-renewables.co.uk/wp-content/uploads/PR-EHC-team-up-with-OLCI-to-provide-Electric-Boiler-training-May-11.jpg" alt="" width="254" height="101" /></strong></h2>
<p><strong>EHC team up with OLCI to provide Electric Boiler Training</strong></p>
<p>EHC have been specialist suppliers of the Fusion Electric Boiler for many years. They have also recently launched the Comet Electric Boiler which incorporates a Stainless Steel Heat Exchanger, Automatic Bypass and Magnetic Filter. Due to the increased Sales and Enquiry levels for Electric Boilers during 2010, EHC consulted with various training organisations throughout the UK to establish the first of its kind Electric Boiler Training course for Installers. After several meetings EHC decided to collaborate with OLCI Construction Training as their preferred Training Partner.</p>
<p>OLCI have National coverage with 13 established Training Centres throughout the UK and specialise in the Plumbing, Gas, Electrical and Renewables Training Courses.<br />
Each Centre has been equipped with a Fusion Electric Boiler training rig to enable Heating Engineers to witness first hand the simplicity of installing an Electric Boiler. The dates for the first courses have now been released (Birmingham 27th June, London 22nd July &amp; Bristol 19th August) with the others to follow. The Course will cover all aspects of installing an Electric Boiler from Power Supply requirements, Boilers sizing and all relevant Regulations.</p>
<p>Anyone wishing to participate in these ground breaking training courses should contact EHC on 01698 820533 for availability and costing details. For full product range details please visit<br />
<a href="http://www.electric-heatingcompany.co.uk">www.electric-heatingcompany.co.uk</a> or <a href="http://www.olci.info" onclick="pageTracker._trackPageview('/outgoing/www.olci.info?referer=');">www.olci.info</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.electric-heatingcompany.co.uk/index.php/blog/ehc-team-up-with-olci/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Fusion Comet Launch</title>
		<link>http://www.electric-heatingcompany.co.uk/index.php/blog/fusion-comet-launch/</link>
		<comments>http://www.electric-heatingcompany.co.uk/index.php/blog/fusion-comet-launch/#comments</comments>
		<pubDate>Fri, 11 Feb 2011 14:30:50 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Industry News]]></category>
		<category><![CDATA[air vent]]></category>
		<category><![CDATA[boilers]]></category>
		<category><![CDATA[digital control panel]]></category>
		<category><![CDATA[Electric Boiler]]></category>
		<category><![CDATA[electric heating company]]></category>
		<category><![CDATA[filter]]></category>
		<category><![CDATA[Fusion Comet]]></category>
		<category><![CDATA[great value]]></category>
		<category><![CDATA[pump]]></category>
		<category><![CDATA[radiators]]></category>
		<category><![CDATA[stylish]]></category>

		<guid isPermaLink="false">http://www.electric-heatingcompany.co.uk/?p=1414</guid>
		<description><![CDATA[
The Comet Electric Boiler is the result of many hours of product development which has taken Electric Boiler Technology to a new level. This outstanding Boiler has all the hallmarks of the award winning Fusion Range however with its improved appearance and size coupled with state of the art components it is without question the [...]]]></description>
			<content:encoded><![CDATA[<p><img class="alignnone size-full wp-image-1428" title="newsbanner" src="http://www.electric-heatingcompany.co.uk/wp-content/uploads/2011/02/newsbanner.jpg" alt="" width="580" height="99" /></p>
<p>The Comet Electric Boiler is the result of many hours of product development which has taken Electric Boiler Technology to a new level. This outstanding Boiler has all the hallmarks of the award winning Fusion Range however with its improved appearance and size coupled with state of the art components it is without question the best value Electric Boiler on the market.</p>
<p><img class="alignnone size-full wp-image-1429" title="newsimage" src="http://www.electric-heatingcompany.co.uk/wp-content/uploads/2011/02/newsimage.jpg" alt="" width="580" height="357" /></p>
<p><strong><a href="http://www.electric-heatingcompany.co.uk/?page_id=1399&amp;preview=true" target="_blank">Find out more &gt;&gt;</a></strong></p>
]]></content:encoded>
			<wfw:commentRss>http://www.electric-heatingcompany.co.uk/index.php/blog/fusion-comet-launch/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Awards</title>
		<link>http://www.electric-heatingcompany.co.uk/index.php/blog/awards/</link>
		<comments>http://www.electric-heatingcompany.co.uk/index.php/blog/awards/#comments</comments>
		<pubDate>Tue, 20 Apr 2010 09:14:54 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Blog]]></category>

		<guid isPermaLink="false">http://www.29studios.com/newsite/?p=871</guid>
		<description><![CDATA[27th November 2008 &#8211;  Best Interbuild Stand at  The Construction Marketing Awards 2008


31  October 2008 &#8211; Heating company  honoured at national excellence awards.
click here to download PDF with full details
]]></description>
			<content:encoded><![CDATA[<p><strong>27th November 2008 &#8211;  Best Interbuild Stand at  The Construction Marketing Awards 2008</strong></p>
<p><strong><br />
</strong></p>
<p><strong>31  October 2008 &#8211; Heating company  honoured at national excellence awards.<br />
<a href="http://www.29studios.com/newsite/wp-content/uploads/2010/04/news-item.pdf" target="_blank" onclick="pageTracker._trackPageview('/outgoing/www.29studios.com/newsite/wp-content/uploads/2010/04/news-item.pdf?referer=');">click here to download PDF with full details</a></strong></p>
]]></content:encoded>
			<wfw:commentRss>http://www.electric-heatingcompany.co.uk/index.php/blog/awards/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

